Shandong Mingchengda Machinery Technology Co., Ltd
Contact:Mr. Wang
Tel:15553703518
Email:china.mcdgs@gmail.com
Website: en.mcdjx.com
Address:Workshop 2, Shandong Gaochuang CNC Equipment Company, located 500 meters south of the intersection of Ning'an Avenue and Mengzi Avenue in Liuxing Street, High tech Zone, Jining City, Shandong Province
Introduction to the operation details of each system of the road filling machine by the manufacturer of the road filling machine:
Engine: Equipped with original Yangma or Kohler diesel engines (engine brand and gasoline/diesel can be selected by the user). Electric starter with oil alarm and smooth operation. Low noise and low fuel consumption.
Hydraulic system: hydraulic motor, electric control valve, stable and reliable system. The hydraulic system is equipped with a hydraulic oil cooler, which can ensure a constant temperature of the hydraulic oil, reduce the amount of hydraulic oil used, and decrease the volume of the hydraulic oil tank.
Heating system: The road grouting machine uses liquefied gas combustion heating. Heating quickly. High combustion heat value and cost-effective. The temperature control system adopts dual temperature control of thermal oil and grout to ensure smooth heating of grout while preventing the temperature of thermal oil from being too high, thus improving the safety of equipment use.
Mixing system: using hydraulic drive for loss mixing The horizontal stirring blades effectively prevent the sealing material from depositing at the bottom of the container while ensuring uniform heating of the sealing material.
The stirring speed can be adjusted. Material pump system: The material pump is driven by a hydraulic motor, which is stable and reliable. The discharge speed of the road grouting machine can be adjusted according to specific construction requirements. Meet various construction requirements, trailer system: high-speed dual axle trailer chassis with handbrake to ensure safe construction of equipment on sloping roads; Equipped with turn signals, brake lights, and warning lights, it fully ensures the safety of the equipment during transportation and operation.
Discharge pipe: The discharge pipe adopts electric heating double-layer stainless steel hose and electric heating discharge head, which can effectively prevent the cooling of the filling material Two types of discharge head diameters meet the requirements of clock construction, and the use of a discharge pipe emptying device at the end of the work can effectively empty the discharge pipe. Get ready to work again. Independent generator: In addition to providing stable power for the equipment itself, it can also provide power for other small maintenance equipment, making it convenient for field construction.